Precision Poly – Internal Equipment Structure

Project: Precision Poly – Internal Equipment Structure

Location: Grand Rapids, MI

Square Footage: 3,000SF

Project Information: FCC Construction designed and built an internal manufacturing equipment structure. Using structural steel, we designed a 4 level mezzanine to house 3 plastic extruding lines and processing equipment. This structure is located within the existing manufacturing floor and required raising the roof an additional 25’. The exterior was clad in insulated metal panels and incorporated HVAC equipment and windows for natural light.

Previous
Previous

MSU TB Simon Power Generation Steel | FCC Construction

Next
Next

GRPS Southwest Community Campus Steel | FCC Construction