Waste Recovery Systems
Project: Waste Recovery Systems
Location: Wyoming, MI
Square Footage: 18,000SF
Project Information: After nearly two years of planning, designing, and permitting the waste processing pits, solidification, containment and haul out, we broke ground on this specialized facility. This space will house vacuum trucks and add to the capacity of liquid and solid waste processing.
FCC had to work very closely with Waste Recovery during construction to incorporate their processing equipment into the facility and to share their busy and tight site. Sitework, pre-engineered erection, IMP panels, miscellanies steel fabrication and install, and general trades were self-performed by FCC.